Regulatory

Choosing between centralised and decentralised procedures: a decision framework for Chinese sponsors.

Chinese sponsors usually arrive at this question with a commercial answer already in mind — all of Europe at once, or three countries to start. The regulation often settles it before commerce gets a vote, and the half of the decision that remains free is won or lost on one choice most teams treat as administrative: the Reference Member State.

In brief

  • Check mandatory scope first. The Annex to Regulation 726/2004 removes the choice entirely for biotechnology products, ATMPs, orphan medicines and new active substances in named therapeutic areas.
  • Centralised buys uniformity; decentralised buys selection. One authorisation and one set of product information, against the countries you actually want and a shorter list of them.
  • The Reference Member State is the decision inside the decision. It is made at submission, it is close to irreversible, and it is usually made on the wrong criteria.
  • Core evidence requirements remain. The CTD structure, quality evidence and pharmacovigilance obligations need to be addressed whichever eligible procedure is used.

What the law decides for you

For a defined set of products the centralised procedure is not an option but an obligation. The Annex to Regulation (EC) No 726/2004 makes it mandatory for medicines developed by specified biotechnological processes, for advanced therapy medicinal products, for orphan medicines, and for medicines containing a new active substance indicated for cancer, neurodegenerative disorders, diabetes, auto-immune diseases and other immune dysfunctions, viral diseases, and AIDS.

Check manufacturing method and legal basis as well as indication. Biotechnological medicines, including relevant biosimilars, fall within mandatory centralised scope. A new active substance in a listed therapeutic area may also be in scope. Drug-led combination products typically follow the medicines route, with device-component assessment as applicable; the component does not itself create a choice of medicines procedure.

Outside the mandatory list the centralised procedure is still available by choice: for a product containing a new active substance, for one that constitutes a significant therapeutic, scientific or technical innovation, or where a central authorisation is in the interest of patients at Union level. The Agency decides whether an optional request is accepted, which makes eligibility a question to raise early rather than assume.

Key takeaway

Establish mandatory scope first, optional eligibility second, and commercial preference third. Teams that reverse the order spend months building a national strategy for a product that was never allowed to use one.

What the centralised procedure buys

One application, one scientific assessment by the Committee for Medicinal Products for Human Use, one opinion, and a Commission decision valid throughout the Union. The scientific assessment runs on a 210 active-day clock, and the word active matters: the clock stops while you answer questions, and those clock-stops are where most of the elapsed calendar time goes.

A centralised authorisation provides harmonised product information and a Union-wide authorisation with a common variation framework. Actual launch still requires applicable supply, local labelling and other obligations to be met. Authorisation does not determine national pricing, reimbursement or adoption.

EMA coordinates the scientific assessment through CHMP, with rapporteur and co-rapporteur input; the Commission makes the authorisation decision. Harmonised product information must reflect the evidence. A negative outcome affects the centralised application, subject to the applicable re-examination process.

What the decentralised route buys

The decentralised procedure, set out in Directive 2001/83/EC, is for products not yet authorised anywhere in the Union. You file an identical dossier in your chosen Member States at once. One of them acts as Reference Member State and prepares the assessment the others respond to; the standard timetable reaches a draft assessment report at around Day 120, closes by Day 210 if the concerned Member States agree, and is followed by a national phase of about 30 days in which each country issues its own authorisation and approves its own translations.

National competent authorities run the decentralised and mutual-recognition procedures. Unresolved concerns may lead to CMDh referral and, where applicable, arbitration. Applicant response periods and national steps add elapsed time; centralised applications also have clock-stops and procedural risks. Compare realistic scenarios rather than assuming one route is faster.

Mutual recognition is the sibling procedure for a product that already holds a national authorisation in one Member State and wants recognition in others. For most Chinese sponsors entering Europe for the first time it is not the starting point, but it matters later — it is how you add countries to a national footprint you have already built.

The decision, in order

Decision tree: mandatory centralised scope, then optional eligibility, then commercial footprint In the mandatory scope of Regulation 726/2004? Yes Centralised procedure No choice to make No Optional centralised eligibility criteria met? Yes Optional centralised Eligibility request to EMA No Already authorised in one Member State? Yes Mutual recognition Extend an existing MA No DCP / national route THEN ASK How many markets, and how soon do you need them? Can one SmPC serve every market you want? Which agency has assessed products like yours? Does a joint clinical assessment apply? These four questions do not change the legal route. They change how well it goes.
First establish mandatory scope and optional eligibility; national-authority routes remain subject to their own conditions. Optional access can include a Union-level patient interest. Drug-led combinations typically follow the medicines route with device-component assessment as applicable. Commercial footprint and payer-evidence needs inform planning within the legally available routes.

Compare total preparation and response time, national steps and evidence gaps, rather than headline review clocks alone.

On referrals to the CMDh

Choosing a Reference Member State

In a decentralised procedure the Reference Member State writes the assessment the other countries argue with. The choice is yours, it is made at submission, and it is close to irreversible. Four things should drive it.

Relevant experience. An agency that has assessed products in your class will ask sharper questions earlier, which is uncomfortable and much faster than a reviewer learning the field on your dossier.

Declared capacity and timetable discipline. Agencies publish their availability to act as RMS and their procedural slots. An RMS that cannot start for two quarters has already cost you more than any assessment difference.

Language and documentation practice. English is standard for the assessment, but national phases are not. Translation and national labelling requirements differ, and they land at the end, when your launch date is already fixed.

Operational and commercial fit. Consider the planned country footprint, local requirements and the workload of maintaining the authorisation. Authorities assess quality, safety and efficacy independently of the sponsor’s commercial success.

What does not change either way

The Common Technical Document structure applies across these routes, with core quality, non-clinical and clinical evidence in Modules 2 to 5. The legal basis, claims and product determine the evidence required. Manufacturing controls, stability, applicable GMP evidence and risk-management planning should begin early and continue throughout development and lifecycle work.

Establishment, batch-release and pharmacovigilance obligations also require early planning. The applicant / MAH must meet EU / EEA establishment requirements; QP certification applies to relevant batch release. The application must contain required pharmacovigilance-system information, including QPPV and master-file location details. Qualified statutory providers and operational responsibilities must be confirmed for the applicable stage.

Administrative requirements, fees, translations and final national steps differ. Compare full programme costs: evidence generation, quality remediation, scientific advice, application work, response capacity and maintenance. Trial design should test comparator, endpoint, population and follow-up choices against regulatory and payer-evidence needs. Adding countries can improve relevance but also adds site, supply and monitoring work; the route alone does not determine the most efficient design.

The three routes compared

The three European routes to a marketing authorisation, and what each one asks of you.
CentralisedDecentralisedMutual recognition
Legal basisRegulation (EC) No 726/2004Directive 2001/83/ECDirective 2001/83/EC
Starting pointMandatory scope or accepted optional eligibilityNo existing EU authorisation for the product at applicationAn existing national authorisation
Who assessesEMA / CHMP scientific assessment; Commission decisionRMS and concerned national competent authoritiesRMS and concerned national competent authorities
CoverageEvery Member State at onceOnly the countries you includedOnly the countries you included
Clock210 active days, then a Commission decisionStandard timetable to Day 210, then about 30 days nationallyRecognition phase of 90 days
If it goes wrongA negative opinion applies Union-wideReferral to the CMDh, then possible arbitrationReferral to the CMDh, then possible arbitration
Best whenScope is mandatory, or you want all markets with one lifecycleA focused launch in selected markets, often for established substancesYou are extending a footprint you already have

The three procedural clocks compared

The bars illustrate procedural milestones rather than elapsed project durations. Centralised assessment counts active days; decentralised procedures also include applicant response periods and possible referrals. Preparation, validation, responses, the Commission decision or national phases must be considered separately.

Illustrative centralised, decentralised and mutual-recognition assessment milestones, excluding preparation and response periods Day 0 Day 90 Day 120 Day 210 Centralised active days only 210 active days at CHMP Commission Decentralised standard timetable Step I to Day 120 Step II to Day 210 National Mutual recognition from an existing MA 90-day recognition National
The bars compare nominal milestones only. Clock-stops, applicant responses, referrals and preparation are not shown. The centralised route ends with a Commission decision; decentralised and mutual-recognition procedures require national authorisation steps, normally planned around 30 days after agreement and required translations.

What the Reference Member State choice decides

Four criteria, what to look at, and where the cost lands if you get it wrong.
CriterionWhat to look atWhere it hurts if wrong
Relevant experienceProducts of your type and class already assessed by that agencyAdditional scientific questions and response work may affect elapsed time
Declared capacityPublished availability to act as RMS and the procedural slots on offerThe procedure does not start, which no amount of dossier quality recovers
National practiceTranslation and labelling requirements, and local administrative stepsThe national phase, when the launch date is already committed
Commercial fitWhether you will actually sell in that countryLifecycle administration and national maintenance work may not fit the planned footprint

How to run the decision

Test mandatory scope against the Annex

Not against the therapeutic area alone. Manufacturing method puts biotechnology products in scope whatever they treat.

Settle eligibility with the Agency

If you are relying on optional access, raise it early. Acceptance is a decision, not an entitlement, and it changes the whole plan.

Write the product information first

Draft the intended claims and product information, then test their evidence basis. DCP and MRP also aim for harmonised product information; different commercial preferences do not remove legal eligibility requirements.

Shortlist two Reference Member States

Score them on the four criteria above, approach both, and keep the second one warm until the slot is confirmed.

Common pitfalls

Common pitfalls

  • Assuming "new active substance" means new in China. The test is novelty in the Union.
  • Choosing an RMS on fee level or reputation rather than on relevant assessment experience and declared capacity.
  • Planning a decentralised procedure for a product whose biotechnological manufacture puts it in mandatory centralised scope.
  • Budgeting the 210 days and forgetting that the clock stops while you answer questions, and that answering well takes weeks.
  • Treating the national phase as a formality. Translations, national labelling and pricing files are where launch dates slip.
  • Starting decentralised in three countries, then discovering the fourth market needed a different SmPC.

EU pharmaceutical legislation is being revised. Check the adopted legal text, publication, application dates and transitional provisions before committing to a filing strategy; proposal or political-agreement dates alone do not establish which rules apply to an application.

How Kaiveo Medical can help

Kaiveo Medical offers founder-led eligibility assessment, route comparison and Reference Member State planning, with evidence, quality and market-access questions considered together. Deliverables and responsibilities are agreed for each engagement. Language support is agreed for each engagement.

Book an introductory call

We aim to reply within two working days. Language support is agreed for each engagement.

Sources

  1. Regulation (EC) No 726/2004 — the centralised procedure, its Annex of mandatory scope, and the optional-access criteria.
  2. Directive 2001/83/EC — the decentralised and mutual recognition procedures and the role of the Reference Member State.
  3. EMA: marketing authorisation and pre-authorisation guidance, including eligibility to the centralised procedure.
  4. CMDh and its procedural guidance — timetables, referrals and best practice for decentralised and mutual recognition procedures.
  5. Regulation (EU) 2021/2282 — joint clinical assessments, relevant to any route once the product is in scope.
  6. European Commission: pharmaceutical strategy for Europe — the context for the revision of the general pharmaceutical legislation.
  7. Council of the EU, 28 September 2026 — the Council’s adoption of the pharma package, and what remains before it enters into force.

Last reviewed: 14 October 2026. This article is general information, not legal or regulatory advice.

Regulatory requirements change. Verify every reference against the official source before relying on it, and treat this article as orientation rather than advice on a specific product.