Market-entry schedules depend on preparation as well as regulatory review. Five early decisions shape the evidence, quality work, legal responsibilities and resources a programme needs. This article explains those decisions without treating a review clock as a project timeline.
In brief
- The pathway is chosen before the clinical plan, not after. In both regions the evidence you need follows from the route, and the route follows from claims that are cheap to change early.
- Chinese data travels, but not automatically. Both regulators ask whether it met an acceptable standard and whether it is relevant to the local population.
- Identify legal roles early. Requirements and appointment timing depend on the product, activity and application. Qualified providers and clear responsibilities belong in the plan.
- Europe and the US may share core evidence. Assess population relevance, comparators, endpoints and quality requirements before deciding what can be reused.
Decision one: the pathway
For EU medicines, establish mandatory centralised scope first, including specified biotechnology products, relevant biosimilars, ATMPs, orphan medicines and new active substances in listed therapeutic areas. EMA / CHMP performs the scientific assessment and the European Commission grants the centralised authorisation. Outside mandatory scope, optional centralised eligibility or national-authority routes may apply: decentralised, mutual recognition or national. The standard centralised assessment uses 210 active days, excluding clock-stops, followed by the Commission decision.
Devices and IVDs follow separate MDR and IVDR classification and conformity rules. Eligible low-risk products may be self-declared; other classes and specified low-risk exceptions require notified-body involvement. CE marking follows the applicable conformity assessment and declaration of conformity, with other market-placement obligations still to meet. Drug-led combination products typically follow the medicines route with device-component assessment as applicable; that assessment is not automatically a CTA prerequisite.
In the US, an IND concerns clinical investigation; marketing routes include NDA 505(b)(1) / 505(b)(2), ANDA for eligible generics, BLA 351(a) for biologics and BLA 351(k) for biosimilars. Device requirements may involve 510(k) clearance, De Novo classification or PMA approval, depending on classification, exemptions and evidence. The PMA 180-day FDA review clock starts at filing; applicant response holds and amendments can make elapsed time longer. Drug-led combinations typically follow a drug or biologic-led route with applicable device-component requirements.
Test whether the intended claims, formulation, manufacturing process and device features support the route you are planning. Changes can alter classification, comparator needs or eligibility and require the evidence plan and budget to be reassessed.
Key takeaway
Pick the pathway before you finalise the clinical plan, not after. In both regions the evidence you need is a function of the route, and the route is a function of claims you are still free to change early and expensive to change late.
Decision two: your Chinese data
Chinese clinical and manufacturing data travels further than most teams expect, and less automatically than they hope. Neither regulator rejects foreign data as a class. Both ask the same two questions: was it generated to an acceptable standard, and is it relevant to the population that will use the product here?
The standard question is answered by good clinical practice compliance, verifiable documentation and inspection-readiness of the sites. The relevance question is answered by science: intrinsic and extrinsic factors — genetics, concomitant medication, standard of care, diagnostic practice — and whether they plausibly alter efficacy or safety. ICH E5 provides the framework for extrapolating between regions, and ICH E17 sets out how to design a multi-regional trial so the question does not arise at the end. The FDA's acceptance of studies not conducted under an IND is governed by 21 CFR 312.120, which sets conditions including GCP conduct and FDA's ability to validate the data through inspection.
Compare a multi-regional design with sequential studies at protocol stage. Country and site feasibility, standard of care, comparator access, endpoints, follow-up, statistical power and data quality determine whether evidence can be shared. More countries can add start-up, monitoring and supply costs; a narrower study can leave relevance gaps. Assess those tradeoffs against regulatory and payer-evidence needs rather than assuming either design saves money.
Trial design should balance evidence relevance, operational feasibility and cost before countries and sites are committed.
Decision two, in one sentenceDecision three: the legal roles
Identify the legal roles required for the product and activity in each market. A distributor appointment does not itself fulfil every regulatory role. Some roles or system details belong in an application; others are triggered by manufacture, importation or market placement. Appointments require appropriately qualified providers and agreed responsibilities.
| Role | Where | Required for | Needed by |
|---|---|---|---|
| Marketing authorisation holder | EU | All medicines | The applicant / MAH must meet EU / EEA establishment requirements |
| Qualified Person (QP) | EU | Batch certification and release of imported medicines | Before the relevant batch certification and release activity |
| QPPV | EU | Pharmacovigilance system | Submission: named in the application |
| Authorised Representative | EU | Devices and IVDs from non-EU manufacturers, as applicable | Before placing on the market; in practice named in the notified-body application |
| PRRC | EU | Device manufacturers and authorised representatives | As required by MDR / IVDR Article 15, including applicable access provisions |
| US Agent | US | Foreign establishments registering with FDA | At establishment registration |
| Initial importer | US | Devices imported into the US | Before first shipment |
The EU Authorised Representative mandate has defined duties under MDR or IVDR Article 11. The representative must meet the applicable requirements, hold required documentation and perform the mandate; liability provisions also apply. Provider suitability, product scope, access to records and responsibilities should be checked before appointment.
Decision four: quality and manufacturing
Quality readiness starts during feasibility and continues through development, submission and the product lifecycle. Review site and supplier controls, data integrity, deviations, investigations, CAPA effectiveness and change control against the requirements that apply. Evidence of an operating system matters alongside the procedures themselves; do not defer this work until an inspection is scheduled.
Importation adds its own layer. Medicines imported into the EU must be certified batch by batch by a QP, against the terms of the marketing authorisation and EU GMP, with Annex 21 of the GMP guide governing importation specifically.
For devices, the US requirement changed materially. FDA's Quality Management System Regulation replaces the old Quality System Regulation and aligns US requirements with ISO 13485, with the rule taking effect on 2 February 2026. For a company that already runs a certified ISO 13485 system for Europe, this narrows the distance between the two markets — but alignment is not identity, and the FDA-specific additions remain.
Decision five: sequencing the two markets
The instinct is to do Europe first because the clinical data is closer to hand, or the US first because one submission reaches one large market. Both instincts are sometimes right. What makes the decision is rarely market size; it is which market's evidence requirement is the binding constraint on your programme.
Assess which manufacturing, stability, non-clinical and clinical evidence can support both markets, then identify differences in comparators, endpoints, population relevance or device routes. Regulatory leads CTA / IND coordination; Clinical coordinates design, country and site options, budget, CRO selection and ethics requirements. Responsibilities and any delegated oversight should be explicit.
One European development now belongs in this decision. Under the Health Technology Assessment Regulation, joint clinical assessments began on 12 January 2025 for oncology medicines and advanced therapy medicinal products, extend to orphan medicines in 2028 and to all centrally authorised medicines in 2030. A JCA is separate from national pricing and reimbursement decisions. Comparator, endpoint and relevant population choices should therefore address regulatory and payer-evidence questions from early planning onward.
The two clocks, side by side
| Dimension | European Union | United States |
|---|---|---|
| Who decides | Centralised: Commission decision on CHMP opinion; other medicine routes: national authorities; devices / IVDs: applicable conformity assessment | FDA throughout, for both medicines and devices |
| Medicines clock | 210 active days at CHMP, excluding clock-stops, then a Commission decision | Application-specific FDA review goals; the clock start depends on the programme |
| Device route | Conformity assessment and CE marking; class-dependent, no public queue | 510(k) clearance, De Novo classification or PMA approval; PMA has a 180-day review clock from filing, excluding applicant holds and subject to amendment extensions |
| Quality standard | EU GMP for medicines; ISO 13485 in practice for devices | cGMP; QMSR for devices, aligned to ISO 13485 from February 2026 |
| Legal presence | EU-established MAH, QP, QPPV; Authorised Representative and PRRC for devices | US Agent, initial importer, FDA establishment registration |
| Access & payment | National pricing and reimbursement; applicable JCA evidence needs should inform early trial planning | Separate payer coverage, coding and payment decisions; plan evidence needs early |
The evidence architecture
Underneath the two timelines sits one body of evidence. Seeing which parts are shared and which fork is what makes parallel running possible, and it is the fastest way to find out whether your programme has a real sequencing problem or an imagined one.
Where to start
If the five decisions are not yet made, these four moves settle most of them and can run concurrently.
Test your product against mandatory centralised scope in the EU and against classification and predicate availability in the US. Where either is uncertain, raise it with the agency rather than assuming.
Separate what is reusable as generated, what is reusable with justification, and what will have to be repeated. The third category is the one that sets your timeline.
Marketing authorisation holder, QP, QPPV, authorised representative, PRRC, US Agent, initial importer. Appoint, contract, and write them into the submission plan.
Compare your current system against EU GMP or ISO 13485 and against cGMP or the QMSR, and treat remediation as a project with a critical path, not a workstream.
Where timelines actually slip
Common pitfalls
- Appointing an EU Authorised Representative or US Agent late, and discovering the submission needs them named.
- Choosing study countries without assessing population relevance, standard of care and the possible need for additional evidence.
- Treating the notified body as a supplier that can be switched. Capacity is finite and queues are long.
- Translating a Chinese dossier rather than rebuilding the argument for a reader who does not know the product.
- Leaving comparator choice to the clinical team when a joint clinical assessment will judge it.
- Assuming authorisation in one market guarantees data acceptance or a shorter review in the other.
None of these are exotic. All of them are decisions made early by people who did not know they were making them, which is the strongest argument for mapping both regulatory systems before the protocol is written rather than after the data is locked.
How Kaiveo Medical can help
Kaiveo Medical offers founder-led pathway assessment, evidence-gap review and scoped planning across regulatory, clinical, quality and medical evidence needs. Deliverables, responsibilities and schedule are agreed for each engagement. Language support is agreed for each engagement.
Book an introductory callWe aim to reply within two working days. Language support is agreed for each engagement.
Sources
- Regulation (EC) No 726/2004 — EU procedures for the authorisation and supervision of medicinal products, including the centralised procedure and its scope.
- Directive 2001/83/EC — the Community code relating to medicinal products for human use, including Qualified Person obligations.
- Regulation (EU) 2017/745 (MDR) — Article 11 authorised representative, Article 15 person responsible for regulatory compliance.
- Regulation (EU) 2021/2282 — health technology assessment, joint clinical assessments and their phased scope.
- EMA: obtaining an EU marketing authorisation, step by step.
- EudraLex Volume 4 — EU guidelines for good manufacturing practice, including Annex 21 on importation.
- FDA: Investigational New Drug (IND) application.
- FDA: Premarket Notification 510(k) and FDA: PMA review process.
- ICH efficacy guidelines — E5 on ethnic factors and E17 on multi-regional clinical trials.
Last reviewed: 14 October 2026. This article is general information, not legal or regulatory advice.
Regulatory requirements change. Verify every reference against the official source before relying on it, and treat this article as orientation rather than advice on a specific product.