Manufacturers who have passed ISO 13485 certification and an NMPA inspection often expect a notified body to be a harder version of the same thing. It is a different thing. The notified body is not certifying your quality system as an end in itself — it is deciding whether your device may be placed on the European market, and it audits the evidence for that decision.
In brief
- Two assessments, not one. The quality system under Annex IX and the technical documentation under Annexes II and III. Manufacturers reliably prepare for the first.
- The cycle never stops. Surveillance at least every 12 months, certificates for no more than five years, and at least one unannounced audit in every five-year window.
- Your suppliers are assessed through you, and an unannounced audit can take place at their site rather than yours.
- Clinical evaluation is where the file is read hardest, and the equivalence route is far narrower than most manufacturers assume.
What the audit actually is
Under the Medical Device Regulation, most devices above the lowest risk class reach the market through a conformity assessment carried out by a notified body designated for the specific codes covering your device. That assessment has two halves, and manufacturers consistently prepare for one of them.
This article focuses on the MDR Annex IX route: QMS assessment and review of technical documentation against Annexes II and III. The depth and sampling of documentation review depend on device class and applicable exceptions, including specific implantable class IIb provisions. IVDs follow the IVDR: performance evaluation and follow-up sit in Annex XIII, rather than the MDR clinical-evaluation framework in Annex XIV.
A notified body can assess only products within its designation. Check the relevant MDR or IVDR codes and specific product scope in the Commission’s NANDO database, then confirm capacity and assessment arrangements before contracting. This check does not guarantee a slot or a particular completion date.
Key takeaway
An ISO 13485 certificate shows you run a quality system. A notified body is asking a harder question: does the evidence in front of me support the claims on this device's label? Prepare the evidence, not only the system.
Initial, surveillance, unannounced
Certification is not an event. The MDR builds a cycle, and the obligations in it run for as long as the device is on the market.
Surveillance assessments happen at least annually under Annex IX. Certificates are issued for a period not exceeding five years. And at least once every five years the notified body must carry out an unannounced audit — at your site and, where appropriate, at your suppliers or subcontractors. A site that is only ready when it knows an auditor is coming is not ready.
The file is audited, not just the system
For MDR devices, clinical evaluation under Annex XIV is a planned, continuous process linking literature, clinical data and appraisal to each intended claim. Equivalence requires technical, biological and clinical justification and sufficient access to supporting data; additional requirements apply to certain class III and implantable devices. IVDR IVDs require performance evaluation under Annex XIII, including scientific validity, analytical and clinical performance. Neither framework guarantees that existing or foreign-generated data will be sufficient.
Map each Annex I safety and performance requirement to current evidence for the actual product. If a new investigation or performance study is needed, compare design options, sites, endpoints, sample size, follow-up and monitoring burden against the gap to be closed. Broader claims or longer follow-up can add evidence value and cost. Plan payer-relevant outcomes early where useful, while keeping CE conformity and reimbursement decisions distinct.
A checklist that says "complies" with a reference to a standard is not evidence. The auditor follows the reference to the test report, and the test report to the device being made now.
On Annex I general safety and performance requirementsYour suppliers are in scope
European conformity assessment treats your supply chain as part of your quality system. Sterilisation, critical components, software, contract manufacturing and testing laboratories are all assessed through you. You must be able to show the controls you apply: qualification, agreements that define responsibilities, change notification, and evidence that you monitor performance rather than assuming it.
Apply supplier controls according to risk and the outsourced activity, wherever a supplier is located. Commercial familiarity does not replace qualification records, appropriate agreements, change control and performance monitoring.
The people named in the file
MDR and IVDR Article 15 set qualification and access requirements for the person responsible for regulatory compliance, including provisions for manufacturers and authorised representatives. Article 11 defines authorised-representative duties. Confirm the applicable arrangement with an appropriately qualified provider, documented mandate and access to records; advisory support does not itself fulfil a statutory appointment.
In practice the authorised representative is often appointed late and chosen on price. The audit will test whether that relationship is real: whether the mandate defines the right tasks, whether the representative holds what it is required to hold, and whether anyone there can answer a question about the device.
Post-market is a system, not a mailbox
Articles 83 to 86 require a post-market surveillance system proportionate to risk, with a plan, and periodic safety update reports for the higher risk classes. Vigilance reporting of serious incidents and field safety corrective actions follows in Articles 87 to 92. Post-market clinical follow-up sits in Annex XIV as part of the clinical evaluation cycle, not as an optional extra.
What auditors look for is the loop closing: complaints and PMCF findings feeding risk management, risk management feeding design and labelling, and the clinical evaluation being updated because of what came back from the field. A system that collects complaints but has never changed anything reads as a system that does not listen.
Language, records and the interpreter
Agree audit language, interpretation and document needs with the notified body in advance. Where records and assessment languages differ, identify which procedures, technical documents and sampled records require translation. Control translated versions and reconcile discrepancies with the originals so that reviewers can verify the evidence.
Where interpretation is needed, use someone with suitable technical understanding and rehearse how staff will explain their own work. Record responsibilities for interpretation and controlled translations. Language support is agreed for each engagement.
How findings are graded, and what happens next
Nonconformities are classified, typically as major or minor, and the classification drives everything that follows. A major finding generally blocks certification or recertification until it is resolved, and resolution means evidence of correction, a root-cause analysis, and a corrective action with a plan to verify that it worked. Notified bodies set deadlines for responses and can close a file that misses them.
The mistake to avoid is answering the symptom. A finding that a batch record lacked a signature is rarely about the signature; it is about whether your system detects missing records. A checkbox alone may not address the cause. Show the process gap, the correction, the corrective action and evidence of effectiveness; the notified body decides whether the response is adequate.
The assessment, end to end
Drawn as one process, the two halves and the loop that follows them are easier to plan against than a list of annexes.
Major or minor, and what each demands
| Major | Minor | |
|---|---|---|
| Typically means | The requirement is not met, or the system cannot show that it is | An isolated lapse in a system that otherwise works |
| Effect on the certificate | Blocks issue or renewal until closed | May permit certification subject to the body’s rules, response acceptance and follow-up |
| Your response must contain | Correction, root cause, corrective action and a plan to verify effectiveness | Correction and a stated cause, with effectiveness checked at the next audit |
| Common mistake | Answering the symptom and adding a checkbox | Treating it as noise until three of them make a pattern |
The preparation sequence
Match your device codes against the notified body's scope in NANDO, and ask about queue and capacity in writing.
Review existing evidence and claims early. For MDR equivalence, establish the required justification and data access; if gaps remain, assess additional clinical evidence. For IVDs, assess the IVDR performance-evaluation requirements.
Quality agreements, qualification records, change notification and performance monitoring for every critical supplier and subcontractor.
Run a mock audit with any planned interpreter and let staff explain their work in the agreed language. Check controlled translations of documents likely to be sampled.
What to have ready
| Assessment | Frequency | Main focus | Have ready |
|---|---|---|---|
| Initial QMS assessment | Once, before certification | Annex IX quality management system | Management review, design controls, CAPA, supplier controls, training records |
| Technical documentation | Per device or by sampling, depending on class | Annexes I, II, III and XIV | GSPR evidence, clinical evaluation report, risk file, verification and validation reports |
| Surveillance | At least every 12 months | That the system still works as certified | Changes since the last audit, complaint and CAPA trends, updated PMS data |
| Unannounced | At least once every five years | Production as it really runs | Current batch records, in-process controls, line clearance, staff who can explain their own work |
| Recertification | Before the certificate's five-year limit | The whole cycle, including what changed | A current clinical evaluation, not one refreshed for the occasion |
Common pitfalls
- Signing with a notified body whose designation does not cover your device codes. Check NANDO first.
- Building the clinical evaluation around equivalence without the access to the comparator's documentation that the MDR requires.
- Treating the unannounced audit as a theoretical risk and keeping the line "audit-ready" only in audit season.
- An authorised representative mandate that names the company but not the tasks the MDR assigns it.
- Post-market surveillance that reports upward but never feeds back into risk management or labelling.
- Leaving capacity to chance: notified body queues are long, and the transitional deadlines of 31 December 2027 and 31 December 2028 apply to legacy certificates only under conditions that had to be met back in 2024. A Commission proposal to simplify the MDR and IVDR (COM(2025) 1023, December 2025) is still in the legislative process; until it is adopted, these deadlines stand.
MDR device clinical investigations and IVDR performance studies have separate regulatory and ethics requirements; they do not use the medicines CTR / CTIS route. Check the applicable standards and editions, including ISO 14155 where relevant. Drug-led combination products typically follow the medicines route with device-component assessment as applicable; do not assume this full device certification sequence applies to every integral combination product.
How Kaiveo Medical can help
Kaiveo Medical offers founder-led, scoped support for documentation and QMS gap assessment, clinical or performance-evidence review, supplier controls and audit preparation. Deliverables and responsibilities are agreed for each engagement. Language support is agreed for each engagement.
Book an introductory callWe aim to reply within two working days. Language support is agreed for each engagement.
Sources
- Regulation (EU) 2017/745 (MDR) — Article 11 authorised representative, Article 15 PRRC, Article 56 certificates, Articles 83 to 92 post-market surveillance and vigilance, Annexes I, II, III, IX and XIV.
- Regulation (EU) 2017/746 (IVDR) — the equivalent framework for in vitro diagnostics.
- Regulation (EU) 2023/607 — the extended transitional provisions and the conditions attached to them.
- Regulation (EU) 2024/1860 — IVDR transition and the gradual roll-out of EUDAMED.
- NANDO — the European Commission's database of notified bodies and their designated scopes.
- MDCG guidance documents — endorsed guidance on clinical evaluation, technical documentation and notified body practice.
- European Commission: notified bodies — designation and oversight.
- ISO 14155 — good clinical practice for clinical investigations of medical devices, revised in 2026.
Last reviewed: 14 October 2026. This article is general information, not legal or regulatory advice.
Regulatory requirements change. Verify every reference against the official source before relying on it, and treat this article as orientation rather than advice on a specific device.
